
New TopShim run:

version = topshim 2.4.0
date = 2024-04-16
time = 14:50:19.216
command = topshim convcomp

FINE SHIMMING

Parameters:

probe = Z163739_0613
solvent = MeOD
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 3.30 ppm
selective excitation width = 1.0 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before=12.3 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration 2: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 3: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration 4: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration 5: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 6: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration 7: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration 8: FWHM Before= 0.3 Hz, Target= 0.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.374

shim changes: 
Z	-298
Z2	+3
Z3	-100
Z4	+27
Z5	+49
Z6	-67
Z7	-1737
Z8	+1823

duration = 1 min 36 sec
completed successfully
finished Tue Apr 16 14:51:54 2024


========================================================================
